<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>FSJ &#8211; The Longhorn Engineer</title>
	<atom:link href="https://longhornengineer.com/tag/fsj/feed/" rel="self" type="application/rss+xml" />
	<link>https://longhornengineer.com</link>
	<description>Robotics, Pinball, Hacking, Portables</description>
	<lastBuildDate>Tue, 20 Dec 2022 21:44:07 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
	<item>
		<title>Gas Tank Skid Plate Reconstruction</title>
		<link>https://longhornengineer.com/2018/11/10/gas-tank-skid-plate-reconstruction/</link>
		
		<dc:creator><![CDATA[Parker]]></dc:creator>
		<pubDate>Sun, 11 Nov 2018 02:51:00 +0000</pubDate>
				<category><![CDATA[1990 Grand Wagoneer]]></category>
		<category><![CDATA[Car Stuff]]></category>
		<category><![CDATA[Fabrication]]></category>
		<category><![CDATA[FSJ]]></category>
		<guid isPermaLink="false">https://longhornengineer.com/?p=3050</guid>

					<description><![CDATA[A common issue with Grand Wagoneers is rusting gas tank skids. Gas tanks on Wagoneers are plastic. To support the weight, the gas tanks are fastened to a metal skid. Then the skid is bolted to the frame. This is a great setup as the gas tank can not rust out and clog fuel filters &#8230; <a href="https://longhornengineer.com/2018/11/10/gas-tank-skid-plate-reconstruction/" class="more-link">Continue reading <span class="screen-reader-text">Gas Tank Skid Plate Reconstruction</span> <span class="meta-nav">&#8594;</span></a>]]></description>
										<content:encoded><![CDATA[<p>A common issue with Grand Wagoneers is rusting gas tank skids. Gas tanks on Wagoneers are plastic. To support the weight, the gas tanks are fastened to a metal skid. Then the skid is bolted to the frame. This is a great setup as the gas tank can not rust out and clog fuel filters but Jeep made the skid plates out of thin metal with poor rust prevention so they do not last.</p>
<figure style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/Gas-Tank-Pulled.jpg"><img fetchpriority="high" decoding="async" class="wp-image-3066 size-medium" src="https://longhornengineer.com/wp-content/uploads/Gas-Tank-Pulled-800x1066.jpg" alt="Pulled gas tank out of the wagon. Dirty!" width="800" height="1066" srcset="https://longhornengineer.com/wp-content/uploads/Gas-Tank-Pulled-800x1066.jpg 800w, https://longhornengineer.com/wp-content/uploads/Gas-Tank-Pulled-113x150.jpg 113w, https://longhornengineer.com/wp-content/uploads/Gas-Tank-Pulled-768x1024.jpg 768w, https://longhornengineer.com/wp-content/uploads/Gas-Tank-Pulled.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption class="wp-caption-text">Pulled gas tank out of the wagon. Dirty!</figcaption></figure>
<p>&nbsp;</p>
<p>I disconnected the fuel lines and fill lines then dropped the tank. Skid is full of dirt and rust. The straps that hold the tank to the skid where rusted through so removing the tank from the skid was easy.</p>
<figure id="attachment_3065" aria-describedby="caption-attachment-3065" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/Dirt-buildup-on-Frame.jpg"><img decoding="async" class="wp-image-3065 size-medium" src="https://longhornengineer.com/wp-content/uploads/Dirt-buildup-on-Frame-800x600.jpg" alt="Frame inspection and cleanup." width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/Dirt-buildup-on-Frame-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/Dirt-buildup-on-Frame-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/Dirt-buildup-on-Frame-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/Dirt-buildup-on-Frame.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3065" class="wp-caption-text">Frame inspection and cleanup.</figcaption></figure>
<p>I then inspected the frame where the gas tank lives. This is also a very common area for rust to happen. This looks bad but the frame was 100% intact. There was ton of dirt build up on the frame that at first looked like rust. The rusted holes in the left side of the picture is left over parts of the skid plate that was still attached to the frame. I cleaned up the frame and painted it with some chassis saver to prevent any further rust.</p>
<figure style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/Skid-cleaned-up.jpg"><img decoding="async" class="wp-image-3067 size-medium" src="https://longhornengineer.com/wp-content/uploads/Skid-cleaned-up-800x1066.jpg" alt="Skid plate cleaned up after removal of gas tank." width="800" height="1066" srcset="https://longhornengineer.com/wp-content/uploads/Skid-cleaned-up-800x1066.jpg 800w, https://longhornengineer.com/wp-content/uploads/Skid-cleaned-up-113x150.jpg 113w, https://longhornengineer.com/wp-content/uploads/Skid-cleaned-up-768x1024.jpg 768w, https://longhornengineer.com/wp-content/uploads/Skid-cleaned-up.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption class="wp-caption-text">Skid plate cleaned up after removal of gas tank.</figcaption></figure>
<p>Then I cleaned up what was left of the skid plate. I was hoping to repair the skid by patching it but the skid was to far gone at this point.</p>
<figure id="attachment_3069" aria-describedby="caption-attachment-3069" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/Skid-Triangle-Bracket.jpg"><img loading="lazy" decoding="async" class="wp-image-3069 size-medium" src="https://longhornengineer.com/wp-content/uploads/Skid-Triangle-Bracket-800x600.jpg" alt="Skid plate triangle brace. Not much left of it!" width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/Skid-Triangle-Bracket-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/Skid-Triangle-Bracket-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/Skid-Triangle-Bracket-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/Skid-Triangle-Bracket.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3069" class="wp-caption-text">Skid plate triangle brace. Not much left of it!</figcaption></figure>
<p>Then pulled the skid plate triangle brace and cleaned it up. Swiss cheese steel. I decided to rebuild the triangle brace first since it will be easier.</p>
<figure id="attachment_3082" aria-describedby="caption-attachment-3082" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_1.jpg"><img loading="lazy" decoding="async" class="wp-image-3082 size-medium" src="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_1-800x1066.jpg" alt="Brackets for the triangle brace." width="800" height="1066" srcset="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_1-800x1066.jpg 800w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_1-113x150.jpg 113w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_1-768x1024.jpg 768w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_1.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3082" class="wp-caption-text">Brackets for the triangle brace.</figcaption></figure>
<p>Built the new bracket parts for the triangle brace. I added nutserts to make install easier later.</p>
<figure id="attachment_3083" aria-describedby="caption-attachment-3083" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_2.jpg"><img loading="lazy" decoding="async" class="wp-image-3083 size-medium" src="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_2-800x600.jpg" alt="Tracing the old brace into cardboard." width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_2-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_2-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_2-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_2.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3083" class="wp-caption-text">Tracing the old brace into cardboard.</figcaption></figure>
<figure id="attachment_3084" aria-describedby="caption-attachment-3084" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_3.jpg"><img loading="lazy" decoding="async" class="wp-image-3084 size-medium" src="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_3-800x600.jpg" alt="Brace traced." width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_3-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_3-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_3-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_3.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3084" class="wp-caption-text">Brace traced.</figcaption></figure>
<figure id="attachment_3085" aria-describedby="caption-attachment-3085" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_4.jpg"><img loading="lazy" decoding="async" class="wp-image-3085 size-medium" src="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_4-800x600.jpg" alt="Cardboard cutout." width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_4-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_4-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_4-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_4.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3085" class="wp-caption-text">Cardboard cutout.</figcaption></figure>
<figure id="attachment_3086" aria-describedby="caption-attachment-3086" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_5.jpg"><img loading="lazy" decoding="async" class="wp-image-3086 size-medium" src="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_5-800x600.jpg" alt="Testing fitting the brackets and cardboard cutout." width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_5-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_5-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_5-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_5.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3086" class="wp-caption-text">Testing fitting the brackets and cardboard cutout.</figcaption></figure>
<p>To make the rest of the triangle brace, I traced it onto some cardboard. Then I cut out the cardboard and mocked it up with the braces I cut out steel.</p>
<figure id="attachment_3087" aria-describedby="caption-attachment-3087" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_6.jpg"><img loading="lazy" decoding="async" class="wp-image-3087 size-medium" src="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_6-800x600.jpg" alt="Cardboard template transferred into steel." width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_6-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_6-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_6-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_6.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3087" class="wp-caption-text">Cardboard template transferred into steel.</figcaption></figure>
<figure id="attachment_3088" aria-describedby="caption-attachment-3088" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_7.jpg"><img loading="lazy" decoding="async" class="wp-image-3088 size-medium" src="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_7-800x600.jpg" alt="Steel cleaned of rust and scale. " width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_7-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_7-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_7-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_7.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3088" class="wp-caption-text">Steel cleaned of rust and scale.</figcaption></figure>
<p>Then I copied the cardboard into some 14AWG steel. The steel was bought LTP (Less Then Prime) which means it is rusted but it was inexpensive. Cut the steel out and then cleaned up with a flappy disc on the grinder.</p>
<figure id="attachment_3089" aria-describedby="caption-attachment-3089" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_8.jpg"><img loading="lazy" decoding="async" class="wp-image-3089 size-medium" src="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_8-800x600.jpg" alt="Brackets tacked to the steel triangle." width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_8-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_8-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_8-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_8.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3089" class="wp-caption-text">Brackets tacked to the steel triangle.</figcaption></figure>
<figure id="attachment_3090" aria-describedby="caption-attachment-3090" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_9.jpg"><img loading="lazy" decoding="async" class="wp-image-3090 size-medium" src="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_9-800x600.jpg" alt="Comparing the original rusted bracket to the new one." width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_9-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_9-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_9-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_9.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3090" class="wp-caption-text">Comparing the original rusted bracket to the new one.</figcaption></figure>
<p>I then tacked the brackets onto the steel and compared it to the original bracket. Looks good to me!</p>
<figure id="attachment_3091" aria-describedby="caption-attachment-3091" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_10.jpg"><img loading="lazy" decoding="async" class="wp-image-3091 size-medium" src="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_10-800x600.jpg" alt="Outside welded and grinded smooth. " width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_10-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_10-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_10-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_10.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3091" class="wp-caption-text">Outside welded and grinded smooth.</figcaption></figure>
<figure id="attachment_3092" aria-describedby="caption-attachment-3092" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_11.jpg"><img loading="lazy" decoding="async" class="wp-image-3092 size-medium" src="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_11-800x600.jpg" alt="Inside welded. New bracket complete!" width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/STR_Rebuild_11-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_11-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_11-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/STR_Rebuild_11.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3092" class="wp-caption-text">Inside welded. New bracket complete!</figcaption></figure>
<p>Triangle brace is complete. Time to start fabricating the skid plate for the gas tank.</p>
<figure id="attachment_3070" aria-describedby="caption-attachment-3070" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_1.jpg"><img loading="lazy" decoding="async" class="wp-image-3070 size-medium" src="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_1-800x600.jpg" alt="Skid plate pieced back together for measurements. " width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_1-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_1-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_1-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_1.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3070" class="wp-caption-text">Skid plate pieced back together for measurements.</figcaption></figure>
<p>I started measuring the skid plate and started cutting some steel.</p>
<figure id="attachment_3071" aria-describedby="caption-attachment-3071" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_2.jpg"><img loading="lazy" decoding="async" class="wp-image-3071 size-medium" src="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_2-800x600.jpg" alt="Skid plate construction. Checking fitment." width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_2-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_2-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_2-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_2.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3071" class="wp-caption-text">Skid plate construction. Checking fitment.</figcaption></figure>
<figure id="attachment_3072" aria-describedby="caption-attachment-3072" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_3.jpg"><img loading="lazy" decoding="async" class="wp-image-3072 size-medium" src="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_3-800x600.jpg" alt="This is my construction technique. Measure, make cardboard cut out, test fit, cut out of steel, and tack up." width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_3-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_3-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_3-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_3.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3072" class="wp-caption-text">This is my construction technique. Measure, make cardboard cut out, test fit, cut out of steel, and tack up.</figcaption></figure>
<figure id="attachment_3073" aria-describedby="caption-attachment-3073" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_4.jpg"><img loading="lazy" decoding="async" class="wp-image-3073 size-medium" src="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_4-800x600.jpg" alt="More test fitment after making the large side panel." width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_4-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_4-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_4-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_4.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3073" class="wp-caption-text">More test fitment after making the large side panel.</figcaption></figure>
<figure id="attachment_3074" aria-describedby="caption-attachment-3074" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_5.jpg"><img loading="lazy" decoding="async" class="wp-image-3074 size-medium" src="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_5-800x600.jpg" alt="Other side of the large panel." width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_5-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_5-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_5-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_5.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3074" class="wp-caption-text">Other side of the large panel.</figcaption></figure>
<figure id="attachment_3075" aria-describedby="caption-attachment-3075" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_6.jpg"><img loading="lazy" decoding="async" class="wp-image-3075 size-medium" src="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_6-800x600.jpg" alt="Rest of the side panels cut out and tacked up." width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_6-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_6-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_6-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_6.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3075" class="wp-caption-text">Rest of the side panels cut out and tacked up.</figcaption></figure>
<figure id="attachment_3076" aria-describedby="caption-attachment-3076" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_7.jpg"><img loading="lazy" decoding="async" class="wp-image-3076 size-medium" src="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_7-800x600.jpg" alt="The gas tank has a lower bulge for the gas pickup. Made a drop down section and fitted up some steel to cap it." width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_7-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_7-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_7-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_7.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3076" class="wp-caption-text">The gas tank has a lower bulge for the gas pickup. Made a drop down section and fitted up some steel to cap it.</figcaption></figure>
<figure id="attachment_3077" aria-describedby="caption-attachment-3077" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_8.jpg"><img loading="lazy" decoding="async" class="wp-image-3077 size-medium" src="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_8-800x600.jpg" alt="Skid plate seam welded and grinded. Lots of metal dust. My respirator was completely black after this. Wear your PPE people." width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_8-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_8-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_8-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_8.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3077" class="wp-caption-text">Skid plate seam welded and grinded. Lots of metal dust. My respirator was completely black after this. Wear your PPE people.</figcaption></figure>
<figure id="attachment_3078" aria-describedby="caption-attachment-3078" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_9.jpg"><img loading="lazy" decoding="async" class="wp-image-3078 size-medium" src="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_9-800x600.jpg" alt="Test fitting the tank with the gas tank straps." width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_9-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_9-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_9-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_9.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3078" class="wp-caption-text">Test fitting the tank with the gas tank straps.</figcaption></figure>
<figure id="attachment_3079" aria-describedby="caption-attachment-3079" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_10.jpg"><img loading="lazy" decoding="async" class="wp-image-3079 size-medium" src="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_10-800x600.jpg" alt="Painted the triangle bracket, skid, and associated brackets in chassis saver to prevent rust." width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_10-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_10-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_10-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_10.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3079" class="wp-caption-text">Painted the triangle bracket, skid, and associated brackets in chassis saver to prevent rust.</figcaption></figure>
<figure id="attachment_3080" aria-describedby="caption-attachment-3080" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_11.jpg"><img loading="lazy" decoding="async" class="wp-image-3080 size-medium" src="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_11-800x600.jpg" alt="Bottom side painted. I drilled holes in the skid for water drainage as you can see here." width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_11-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_11-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_11-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_11.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3080" class="wp-caption-text">Bottom side painted. I drilled holes in the skid for water drainage as you can see here.</figcaption></figure>
<figure id="attachment_3081" aria-describedby="caption-attachment-3081" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_12.jpg"><img loading="lazy" decoding="async" class="wp-image-3081 size-medium" src="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_12-800x600.jpg" alt="Gas tank fitted, vent lines plumbed, and fuel sender installed." width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_12-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_12-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_12-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/Skid_Rebuild_12.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3081" class="wp-caption-text">Gas tank fitted, vent lines plumbed, and fuel sender installed.</figcaption></figure>
<p>With the skid plate and triangle bracket fabricated and painted I installed the gas tank. Before that I cleaned out the gas tank with a pressure washer and dried it out. Then the gas tank received new gas tank straps, vents, vent hoses, and sending unit.</p>
<figure id="attachment_3068" aria-describedby="caption-attachment-3068" style="width: 800px" class="wp-caption aligncenter"><a href="https://longhornengineer.com/wp-content/uploads/Skid-installed.jpg"><img loading="lazy" decoding="async" class="wp-image-3068 size-medium" src="https://longhornengineer.com/wp-content/uploads/Skid-installed-800x600.jpg" alt="Gas tank with new skid installed under the wagon!" width="800" height="600" srcset="https://longhornengineer.com/wp-content/uploads/Skid-installed-800x600.jpg 800w, https://longhornengineer.com/wp-content/uploads/Skid-installed-150x113.jpg 150w, https://longhornengineer.com/wp-content/uploads/Skid-installed-768x576.jpg 768w, https://longhornengineer.com/wp-content/uploads/Skid-installed.jpg 1024w" sizes="(max-width: 800px) 100vw, 800px" /></a><figcaption id="caption-attachment-3068" class="wp-caption-text">Gas tank with new skid installed under the wagon!</figcaption></figure>
<p>I then installed the skid under the wagon. Fit great and now I do not have to worry about the gas tank falling out.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
